Train-18 records all broken speed, Speedometer touches 180 KM / h figureTechnology 

Train-18 records all broken speed, Speedometer touches 180 KM / h figure

Train-18

New Delhi: The country’s fastest and first semi-high-speed engine, Train-18 has been approved to run officially. Railway Minister Piyush Goyal shared the video of the train running on his Twitter account. The video can be clearly seen in the speed of 180 kilometers per hour running on the train track. It is the fastest train in the country. This train has left the capital and centenary a lot behind in the case.

Train-18
Train-18

According to sources, this train will be run from Prime Minister Narendra Modi‘s Lok Sabha constituency Varanasi to New Delhi. The Prime Minister will flag this train himself. The journey from one side of this train will be about 8 hours. At present, trains take 12 to 17 hours to reach Varanasi from Delhi. Train 18 will travel from Varanasi to New Delhi on a single day and make the journey to come.

There will be very few stops on this train route. After this train has been run from New Delhi, Ghaziabad, Kanpur, Allahabad will stop it later at Varanasi railway stations. This train will be run on Delhi Howrah route between New Delhi and New Delhi, after which the train will not be able to fly. In fact, the number of trains on the Delhi Hammer route is already higher than the standards. That is why this car is being run from this route.

Train-18 Interior Design
Train-18 Interior Design

The T-18 trains have all the features of modern trains running in Europe. This train is the country’s first train set. There is no need to put engine in it. The first coach also has a cabin for the driver. To get into the train from the platform, a platform is provided in the train which automatically adjusts. The Aerodynamic plan of this train helps in expanding its speed. There are sums of 16 mentors in the vehicle, of which there are two official class mentors. Let me tell you, CCRS has written a letter to the Railway Board about Train-18, which has given a talk about speed. It says that if the train is run between 130 to 160 kilometers then the first track will be secured through fencing. Therefore, it is expected that this train will run at a speed of 130 km / hour. After finishing work is completed, speed limit will be extended.

Related posts

Leave a Comment

error: Content is protected !!